On the 18/10/2025, a breakdown has occured on the aft main sail (top panel damaged). Forward mast sails are still fully functionnal and Neoliner Origin is underway in hybrid mode (sail + engine).
Due to heavy weather conditions met by the vessel on the last days, un delay is expected. Here-after the updated ETA for next calls:
- ETA SPM : 24/10/2025, at 19H00 am (Local Time UTC -2)
- ETA Baltimore : 30/10/2025, at 07H00 am (Local Time UTC -4)